Ecologi

Disrupting an Industry…For this Reason we Launch “Zuidas Technologies”.

I still remember my first day after graduation when I joined Shaker consultancy group; which was ranked the first Mechanical, Electrical, Plumbing (MEP) consultant in Egypt in the year 2001. Their main office was in Mohandseen. At the time, Mohandseen was an upper-class district, most of its residents were the crème de la crème of the Egyptian society; it was the community of politicians, ministers, and artists.

We created designs for Heating, Ventilation, and Air Conditioning systems (HVAC) for all the significant projects in Egypt near the Nile river, like The Four Seasons hotels and Nile City.  One of the biggest projects I participated in was The American University in Cairo which is currently located in The Fifth Settlement district. In 2001, nobody lived in The Fifth Settlement, it was literally a desert, and in the time of 18 years, it turned into one of the most distinguished places in Cairo, to work, to study, and to live.

In 2008, I worked for Dar Alhandasah in Dubai. Now, in 2018 Dubai is another city. Its buildings and towers tell us the story of “How to build a city from scratch.”

Every building around the world tells its own story; however, I am always inspired by the stories of the technologies inside these buildings. I always dream of the buildings of tomorrow; their places, what they’re made of, and the story each building would tell the future generations.

Four years ago, I decided to follow my passion and start my own business; a company that works on buildings’ technologies and solutions. Today I’m developing my business model to introduce an advanced version that could take this industry to its highest levels. I believe that that could be achieved through raising the standards of buildings’ technologies, being energy efficient and smarter than before.

I am here today to lunch our new company Zuidas Technologies; an innovative integrated energy efficient solution to develop livable, energy efficient, and smart commercial buildings, and a turnkey solution provider from the basis of design till operation. Our core purpose is to create healthier working, living, and learning environments by using top-notch technologies. From this perspective, we extend our boundaries and keep innovating continuously to develop a new generation of buildings.

With a group of experts and professionals, we are establishing a new baseline for energy efficient buildings, using a new project delivery methodology to save up to 50% of the energy normally consumed.

Meeting the 50% energy savings goal is challenging, and according to the Advanced Energy Design Guides of Office Buildings written by the American Society of Heating, Refrigerating and Air-Conditioning Engineers, it requires essential principles:

  • 1- Obtain building owner buy-in. 

There must be a strong buy-in from the owner and the operator’s leadership and staff. The more they know about and participate in the planning and design process, the better they will be able to achieve the 50% energy saving goal. The building owner must set his goals and provide the guidance required to turn his vision into a reality.

  • 2- Assemble an experienced, innovative design team.

Interest and experience in designing energy-efficient buildings, innovative thinking, and the ability to work together as a team is critical to meeting the 50% goal. The team achieves this goal by creating a building that maximizes daylighting; minimizes process, heating, and cooling loads; and has highly efficient lighting and HVAC systems. Energy goals should be communicated in the request for proposal and design team selection based in part on the team’s ability to meet the goals. The design team implements the goals for the owner.

  • 3- Adopt an integrated design process. 

Cost-effective, energy-efficient design requires trade-offs among potential energy-saving features. This requires an integrated approach to building design. A highly efficient lighting system, for instance, may cost more than a conventional one, but because it produces less heat, the building’s cooling system can often be downsized. The greater the energy savings, the more complicated the trade-offs become and the more design team members must work together to determine the optimal mix of energy saving features. Because many options are available, the design team will have wide latitude in making energy-saving trade-offs.

  • 4- Consider a daylighting consultant.

Daylighting is an important energy savings strategy to achieve the 50% energy saving goal; however, it requires good technical daylighting design. If the design team does not have experience with a well-balanced daylighting design, it may need to add a daylighting consultant.

  • 5- Consider energy modeling.

This Guide provides a few design packages to help achieve energy savings of 50% without energy modeling, but whole-building energy modeling programs can provide more flexibility to evaluate the energy-efficient measures on an individual project. These simulation programs have learning curves of varying difficulty, but energy modeling for office design is highly encouraged and is considered necessary for achieving energy savings of 50%. Part of the key to energy savings is using the simulations to make envelope decisions first and then evaluating heating, cooling, and lighting systems. Developing HVAC load calculations is not energy modeling and is not a substitute for energy modeling.

  • 6- Use building commissioning.

Studies verify that building systems, no matter how carefully designed, are often improperly installed or set up and do not operate as efficiently as expected. The 50% goal can best be achieved through building commissioning (Cx), a systematic process of ensuring that all building systems—including envelope, lighting, and HVAC—perform as intended.

  • 7- Train building users and operations staff.

Staff training can be part of the building Cx process, but a plan must be in place to train staff for the life of the building to meet energy savings goals. The building’s designers and contractors normally are not responsible for the office after it becomes operational, so the building owner must establish a continuous training program that helps occupants and operation and maintenance staff maintain and operate the building for maximum energy efficiency. This training should include information about the impact of plug loads on energy use and the importance of using energy-efficient equipment and appliances.

  • 8- Monitor the building. 

A monitoring plan is necessary to ensure that energy goals are met over the life of the building. Even simple plans, such as recording and plotting monthly utility bills, can help ensure that the energy goals are met. Buildings that do not meet the design goals often have operational issues that should be corrected.

Under traditional design processes, energy use or a building’s overall energy performance is not typically discussed in any meaningful way by engineers, architects, and building owners at a conceptual design level discussion. For INTEGRATED PROJECT DELIVERY (IPD) to truly be successful at obtaining energy savings in the range of greater than 50%, this tendency needs to change. All parties need to engage in much more detailed dialog earlier in the design process—using a team approach— taking the time to understand how their portion of the work affects the greater design of the whole project.

PRINCIPLES OF INTEGRATED PROJECT DELIVERY (IPD)

Integrated Project Delivery (IPD) is a new concept for design and construction that uses a team approach to project management throughout all phases of the design process.

In a traditional system, the owner, designers, consultants, and constructors work on a fragmented basis, with success often based strictly on the profit received (to each) rather than the overall success of the final product. In IPD, all parties involved in the development of a building work together to achieve the common goal of maximizing multiple efficiencies of the building by having a more collaborative design and construction process. This approach is intended to not only save money but also provide higher-performing buildings that have been seen with the traditional approach.

IPD is a method that conscientiously moves toward a more open and transparent agreement, focusing on mutual benefits and rewards by encouraging parties to converge on the project outcomes rather than their individual goals. Project goals must be defined and recorded early in the project.

Figure 1-1 Traditional Project Design Team

Figure 1-2 Integrated Project Design Team

High-performance building design should be the focus for the future, and IPD will be the cornerstone for the evolution to more effective results in actual building performance.

USING IPD TO MAXIMIZE ENERGY EFFICIENCY

As noted previously, IPD revolves around key collaboration agreements meant to remove barriers between parties and to encourage early contributions of wisdom and experience. While other sources are better suited to provide guidance on the contractual and organizational aspects, this section provides an idealized design management guidance template that describes how to use the more open relationships to achieve high energy-efficiency goals in the building design. Figure 1-3 gives a snapshot of the key steps in each phase that help lead toward energy efficient solutions.

ONGOING TENANTS TRAINING

In buildings designed for low energy use, it is always important to remember that occupant behavior is crucial to achieving the anticipated performance. When people understand the goals of the building and their roles, they can substantially reduce energy use. It can be beneficial for the design and construction team to host a lunchtime talk for the initial tenants and describe the building’s design intent and sustainability features. This is the ideal venue to introduce the occupants to the tenant education guide described previously and to allow the local leadership to state their support for the energy-efficiency initiative in the building. It is important to forewarn occupants that although the building was commissioned, low-energy buildings sometimes take a season or two to reach their final optimized control strategies, so all occupants are invited to submit comments on performance as additional inputs for improving the operations. This type of personal engagement will not only encourage positive-impact behaviors with the initial tenants, but these first adopters can act as efficiency coaches for all future staff members

news-1701

yakinjp

yakinjp

rtp yakinjp

yakinjp

yakinjp

yakin jp

yakinjp id

maujp

maujp

maujp

\

sabung ayam online

sabung ayam online

SLOT MAHJONG

sabung ayam online

article 0000241

article 0000242

article 0000243

article 0000244

article 0000245

article 0000246

article 0000247

article 0000248

article 0000249

article 0000250

article 0000251

article 0000252

article 0000253

article 0000254

article 0000255

article 0000256

article 0000257

article 0000258

article 0000259

article 0000260

article 0000261

article 0000262

article 0000263

article 0000264

article 0000265

article 0000266

article 0000267

article 0000268

article 0000269

article 0000270

article 0000271

article 0000272

article 0000273

article 0000274

article 0000275

article 0000276

article 0000277

article 0000278

article 0000279

article 0000280

article 0000281

article 0000282

article 0000283

article 0000284

article 0000285

article 0000286

article 0000287

article 0000288

article 0000289

article 0000290

article 0000291

article 0000292

article 0000293

article 0000294

article 0000295

article 0000296

article 0000297

article 0000298

article 0000299

article 0000300

article 888896

article 888897

article 888898

article 888899

article 888900

article 888901

article 888902

article 888903

article 888904

article 888905

article 888906

article 888907

article 888908

article 888909

article 888910

article 888911

article 888912

article 888913

article 888914

article 888915

article 888916

article 888917

article 888918

article 888919

article 888920

article 888921

article 888922

article 888923

article 888924

article 888925

article 2990236

article 2990237

article 2990238

article 2990239

article 2990240

article 2990241

article 2990242

article 2990243

article 2990244

article 2990245

article 2990246

article 2990247

article 2990248

article 2990249

article 2990250

article 2990251

article 2990252

article 2990253

article 2990254

article 2990255

article 2990256

article 2990257

article 2990258

article 2990259

article 2990260

article 2990261

article 2990262

article 2990263

article 2990264

article 2990265

article 2990266

article 2990267

article 2990268

article 2990269

article 2990270

article 2990271

article 2990272

article 2990273

article 2990274

article 2990275

article 2990276

article 2990277

article 2990278

article 2990279

article 2990280

article 2990281

article 2990282

article 2990283

article 2990284

article 2990285

article 2990286

article 2990287

article 2990288

article 2990289

article 2990290

article 2990291

article 2990292

article 2990293

article 2990294

article 2990295

article 2990296

article 2990297

article 2990298

article 2990299

article 2990300

article 2990301

article 2990302

article 2990303

article 2990304

article 2990305

article 2990306

article 2990307

article 2990308

article 2990309

article 2990310

article 2000196

article 2000197

article 2000198

article 2000199

article 2000200

article 2000201

article 2000202

article 2000203

article 2000204

article 2000205

article 2000206

article 2000207

article 2000208

article 2000209

article 2000210

article 2000211

article 2000212

article 2000213

article 2000214

article 2000215

article 2000216

article 2000217

article 2000218

article 2000219

article 2000220

article 2000221

article 2000222

article 2000223

article 2000224

article 2000225

article 2000226

article 2000227

article 2000228

article 2000229

article 2000230

article 2000231

article 2000232

article 2000233

article 2000234

article 2000235

article 2000236

article 2000237

article 2000238

article 2000239

article 2000240

article 2000241

article 2000242

article 2000243

article 2000244

article 2000245

article 2000246

article 2000247

article 2000248

article 2000249

article 2000250

article 2000251

article 2000252

article 2000253

article 2000254

article 2000255

article 992000171

article 992000172

article 992000173

article 992000174

article 992000175

article 992000176

article 992000177

article 992000178

article 992000179

article 992000180

article 992000181

article 992000182

article 992000183

article 992000184

article 992000185

article 992000186

article 992000187

article 992000188

article 992000189

article 992000190

article 992000191

article 992000192

article 992000193

article 992000194

article 992000195

article 992000196

article 992000197

article 992000198

article 992000199

article 992000200

article 7700156

article 7700157

article 7700158

article 7700159

article 7700160

article 7700161

article 7700162

article 7700163

article 7700164

article 7700165

article 7700166

article 7700167

article 7700168

article 7700169

article 7700170

article 7700171

article 7700172

article 7700173

article 7700174

article 7700175

article 7700176

article 7700177

article 7700178

article 7700179

article 7700180

article 7700181

article 7700182

article 7700183

article 7700184

article 7700185

article 5500126

article 5500127

article 5500128

article 5500129

article 5500130

article 5500131

article 5500132

article 5500133

article 5500134

article 5500135

article 5500136

article 5500137

article 5500138

article 5500139

article 5500140

article 5500141

article 5500142

article 5500143

article 5500144

article 5500145

article 5500146

article 5500147

article 5500148

article 5500149

article 5500150

article 5500151

article 5500152

article 5500153

article 5500154

article 5500155

article 5500156

article 5500157

article 5500158

article 5500159

article 5500160

article 5500161

article 5500162

article 5500163

article 5500164

article 5500165

article 5500166

article 5500167

article 5500168

article 5500169

article 5500170

article 5500171

article 5500172

article 5500173

article 5500174

article 5500175

article 5500176

article 5500177

article 5500178

article 5500179

article 5500180

article 5500181

article 5500182

article 5500183

article 5500184

article 5500185

article 5500186

article 5500187

article 5500188

article 5500189

article 5500190

article 5500191

article 5500192

article 5500193

article 5500194

article 5500195

news-1701