Ecologi

Disrupting an Industry…For this Reason we Launch “Zuidas Technologies”.

I still remember my first day after graduation when I joined Shaker consultancy group; which was ranked the first Mechanical, Electrical, Plumbing (MEP) consultant in Egypt in the year 2001. Their main office was in Mohandseen. At the time, Mohandseen was an upper-class district, most of its residents were the crème de la crème of the Egyptian society; it was the community of politicians, ministers, and artists.

We created designs for Heating, Ventilation, and Air Conditioning systems (HVAC) for all the significant projects in Egypt near the Nile river, like The Four Seasons hotels and Nile City.  One of the biggest projects I participated in was The American University in Cairo which is currently located in The Fifth Settlement district. In 2001, nobody lived in The Fifth Settlement, it was literally a desert, and in the time of 18 years, it turned into one of the most distinguished places in Cairo, to work, to study, and to live.

In 2008, I worked for Dar Alhandasah in Dubai. Now, in 2018 Dubai is another city. Its buildings and towers tell us the story of “How to build a city from scratch.”

Every building around the world tells its own story; however, I am always inspired by the stories of the technologies inside these buildings. I always dream of the buildings of tomorrow; their places, what they’re made of, and the story each building would tell the future generations.

Four years ago, I decided to follow my passion and start my own business; a company that works on buildings’ technologies and solutions. Today I’m developing my business model to introduce an advanced version that could take this industry to its highest levels. I believe that that could be achieved through raising the standards of buildings’ technologies, being energy efficient and smarter than before.

I am here today to lunch our new company Zuidas Technologies; an innovative integrated energy efficient solution to develop livable, energy efficient, and smart commercial buildings, and a turnkey solution provider from the basis of design till operation. Our core purpose is to create healthier working, living, and learning environments by using top-notch technologies. From this perspective, we extend our boundaries and keep innovating continuously to develop a new generation of buildings.

With a group of experts and professionals, we are establishing a new baseline for energy efficient buildings, using a new project delivery methodology to save up to 50% of the energy normally consumed.

Meeting the 50% energy savings goal is challenging, and according to the Advanced Energy Design Guides of Office Buildings written by the American Society of Heating, Refrigerating and Air-Conditioning Engineers, it requires essential principles:

  • 1- Obtain building owner buy-in. 

There must be a strong buy-in from the owner and the operator’s leadership and staff. The more they know about and participate in the planning and design process, the better they will be able to achieve the 50% energy saving goal. The building owner must set his goals and provide the guidance required to turn his vision into a reality.

  • 2- Assemble an experienced, innovative design team.

Interest and experience in designing energy-efficient buildings, innovative thinking, and the ability to work together as a team is critical to meeting the 50% goal. The team achieves this goal by creating a building that maximizes daylighting; minimizes process, heating, and cooling loads; and has highly efficient lighting and HVAC systems. Energy goals should be communicated in the request for proposal and design team selection based in part on the team’s ability to meet the goals. The design team implements the goals for the owner.

  • 3- Adopt an integrated design process. 

Cost-effective, energy-efficient design requires trade-offs among potential energy-saving features. This requires an integrated approach to building design. A highly efficient lighting system, for instance, may cost more than a conventional one, but because it produces less heat, the building’s cooling system can often be downsized. The greater the energy savings, the more complicated the trade-offs become and the more design team members must work together to determine the optimal mix of energy saving features. Because many options are available, the design team will have wide latitude in making energy-saving trade-offs.

  • 4- Consider a daylighting consultant.

Daylighting is an important energy savings strategy to achieve the 50% energy saving goal; however, it requires good technical daylighting design. If the design team does not have experience with a well-balanced daylighting design, it may need to add a daylighting consultant.

  • 5- Consider energy modeling.

This Guide provides a few design packages to help achieve energy savings of 50% without energy modeling, but whole-building energy modeling programs can provide more flexibility to evaluate the energy-efficient measures on an individual project. These simulation programs have learning curves of varying difficulty, but energy modeling for office design is highly encouraged and is considered necessary for achieving energy savings of 50%. Part of the key to energy savings is using the simulations to make envelope decisions first and then evaluating heating, cooling, and lighting systems. Developing HVAC load calculations is not energy modeling and is not a substitute for energy modeling.

  • 6- Use building commissioning.

Studies verify that building systems, no matter how carefully designed, are often improperly installed or set up and do not operate as efficiently as expected. The 50% goal can best be achieved through building commissioning (Cx), a systematic process of ensuring that all building systems—including envelope, lighting, and HVAC—perform as intended.

  • 7- Train building users and operations staff.

Staff training can be part of the building Cx process, but a plan must be in place to train staff for the life of the building to meet energy savings goals. The building’s designers and contractors normally are not responsible for the office after it becomes operational, so the building owner must establish a continuous training program that helps occupants and operation and maintenance staff maintain and operate the building for maximum energy efficiency. This training should include information about the impact of plug loads on energy use and the importance of using energy-efficient equipment and appliances.

  • 8- Monitor the building. 

A monitoring plan is necessary to ensure that energy goals are met over the life of the building. Even simple plans, such as recording and plotting monthly utility bills, can help ensure that the energy goals are met. Buildings that do not meet the design goals often have operational issues that should be corrected.

Under traditional design processes, energy use or a building’s overall energy performance is not typically discussed in any meaningful way by engineers, architects, and building owners at a conceptual design level discussion. For INTEGRATED PROJECT DELIVERY (IPD) to truly be successful at obtaining energy savings in the range of greater than 50%, this tendency needs to change. All parties need to engage in much more detailed dialog earlier in the design process—using a team approach— taking the time to understand how their portion of the work affects the greater design of the whole project.

PRINCIPLES OF INTEGRATED PROJECT DELIVERY (IPD)

Integrated Project Delivery (IPD) is a new concept for design and construction that uses a team approach to project management throughout all phases of the design process.

In a traditional system, the owner, designers, consultants, and constructors work on a fragmented basis, with success often based strictly on the profit received (to each) rather than the overall success of the final product. In IPD, all parties involved in the development of a building work together to achieve the common goal of maximizing multiple efficiencies of the building by having a more collaborative design and construction process. This approach is intended to not only save money but also provide higher-performing buildings that have been seen with the traditional approach.

IPD is a method that conscientiously moves toward a more open and transparent agreement, focusing on mutual benefits and rewards by encouraging parties to converge on the project outcomes rather than their individual goals. Project goals must be defined and recorded early in the project.

Figure 1-1 Traditional Project Design Team

Figure 1-2 Integrated Project Design Team

High-performance building design should be the focus for the future, and IPD will be the cornerstone for the evolution to more effective results in actual building performance.

USING IPD TO MAXIMIZE ENERGY EFFICIENCY

As noted previously, IPD revolves around key collaboration agreements meant to remove barriers between parties and to encourage early contributions of wisdom and experience. While other sources are better suited to provide guidance on the contractual and organizational aspects, this section provides an idealized design management guidance template that describes how to use the more open relationships to achieve high energy-efficiency goals in the building design. Figure 1-3 gives a snapshot of the key steps in each phase that help lead toward energy efficient solutions.

ONGOING TENANTS TRAINING

In buildings designed for low energy use, it is always important to remember that occupant behavior is crucial to achieving the anticipated performance. When people understand the goals of the building and their roles, they can substantially reduce energy use. It can be beneficial for the design and construction team to host a lunchtime talk for the initial tenants and describe the building’s design intent and sustainability features. This is the ideal venue to introduce the occupants to the tenant education guide described previously and to allow the local leadership to state their support for the energy-efficiency initiative in the building. It is important to forewarn occupants that although the building was commissioned, low-energy buildings sometimes take a season or two to reach their final optimized control strategies, so all occupants are invited to submit comments on performance as additional inputs for improving the operations. This type of personal engagement will not only encourage positive-impact behaviors with the initial tenants, but these first adopters can act as efficiency coaches for all future staff members

news-1701

yakinjp

yakinjp

maujp

TOTOMACAU

sabung ayam online

sabung ayam online

sabung ayam online

sabung ayam online

article 8888000686

article 8888000687

article 8888000688

article 8888000689

article 8888000690

article 8888000691

article 8888000692

article 8888000693

article 8888000694

article 8888000695

article 8888000696

article 8888000697

article 8888000698

article 8888000699

article 8888000700

article 8888000701

article 8888000702

article 8888000703

article 8888000704

article 8888000705

article 8888000706

article 8888000707

article 8888000708

article 8888000709

article 8888000710

article 8888000711

article 8888000712

article 8888000713

article 8888000714

article 8888000715

article 8888000716

article 8888000717

article 8888000718

article 8888000719

article 8888000720

article 8888000721

article 8888000722

article 8888000723

article 8888000724

article 8888000725

mahjong 9998000701

mahjong 9998000702

mahjong 9998000703

mahjong 9998000704

mahjong 9998000705

mahjong 9998000706

mahjong 9998000707

mahjong 9998000708

mahjong 9998000709

mahjong 9998000710

mahjong 9998000711

mahjong 9998000712

mahjong 9998000713

mahjong 9998000714

mahjong 9998000715

mahjong 9998000716

mahjong 9998000717

mahjong 9998000718

mahjong 9998000719

mahjong 9998000720

mahjong 9998000721

mahjong 9998000722

mahjong 9998000723

mahjong 9998000724

mahjong 9998000725

mahjong 9998000726

mahjong 9998000727

mahjong 9998000728

mahjong 9998000729

mahjong 9998000730

mahjong 9998000731

mahjong 9998000732

mahjong 9998000733

mahjong 9998000734

mahjong 9998000735

mahjong 9998000736

mahjong 9998000737

mahjong 9998000738

mahjong 9998000739

mahjong 9998000740

mahjong 9998000741

mahjong 9998000742

mahjong 9998000743

mahjong 9998000744

mahjong 9998000745

mahjong 9998000746

mahjong 9998000747

mahjong 9998000748

mahjong 9998000749

mahjong 9998000750

mahjong 838000788

mahjong 838000789

mahjong 838000790

mahjong 838000791

mahjong 838000792

mahjong 838000793

mahjong 838000794

mahjong 838000795

mahjong 838000796

mahjong 838000797

mahjong 838000798

mahjong 838000799

mahjong 838000800

mahjong 838000801

mahjong 838000802

mahjong 838000803

mahjong 838000804

mahjong 838000805

mahjong 838000806

mahjong 838000807

mahjong 838000808

mahjong 838000809

mahjong 838000810

mahjong 838000811

mahjong 838000812

mahjong 838000813

mahjong 838000814

mahjong 838000815

mahjong 838000816

mahjong 838000817

mahjong 838000818

mahjong 838000819

mahjong 838000820

mahjong 838000821

mahjong 838000822

mahjong 838000823

mahjong 838000824

mahjong 838000825

mahjong 838000826

mahjong 838000827

mahjong 838000828

mahjong 838000829

mahjong 838000830

mahjong 838000831

mahjong 838000832

mahjong 838000833

mahjong 838000834

mahjong 838000835

mahjong 838000836

mahjong 838000837

article 5500346

article 5500347

article 5500348

article 5500349

article 5500350

article 5500351

article 5500352

article 5500353

article 5500354

article 5500355

article 5500356

article 5500357

article 5500358

article 5500359

article 5500360

article 5500361

article 5500362

article 5500363

article 5500364

article 5500365

article 5500366

article 5500367

article 5500368

article 5500369

article 5500370

article 5500371

article 5500372

article 5500373

article 5500374

article 5500375

article 5500376

article 5500377

article 5500378

article 5500379

article 5500380

article 5500381

article 5500382

article 5500383

article 5500384

article 5500385

mahjong 2000546

article 2000547

article 2000548

article 2000549

article 2000550

article 2000551

article 2000552

article 2000553

article 2000554

article 2000555

article 2000556

article 2000557

article 2000558

article 2000559

article 2000560

article 2000561

article 2000562

article 2000563

article 2000564

article 2000565

article 2000566

article 2000567

article 2000568

article 2000569

article 2000570

article 2000571

article 2000572

article 2000573

article 2000574

article 2000575

article 2000576

article 2000577

article 2000578

article 2000579

article 2000580

article 2000581

article 2000582

article 2000583

article 2000584

article 2000585

article 2000586

article 2000587

article 2000588

article 2000589

article 2000590

article 2000591

article 2000592

article 2000593

article 2000594

article 2000595

mahjong 2990612

article 2990606

article 2990607

article 2990608

article 2990609

article 2990610

article 2990611

article 2990613

article 2990614

article 2990615

article 2990616

article 2990617

article 2990618

article 2990619

article 2990620

article 2990621

article 2990622

article 2990623

article 2990624

article 2990625

article 2990626

article 2990627

article 2990628

article 2990629

article 2990630

article 2990631

article 2990632

article 2990633

article 2990634

article 2990635

article 2990636

article 2990637

article 2990638

article 2990639

article 2990640

article 2990641

article 2990642

article 2990643

article 2990644

article 2990645

article 2990646

article 2990647

article 2990648

article 2990649

article 2990650

article 2990651

article 2990652

article 2990653

article 2990654

article 2990655

artikel 000000091

artikel 000000092

artikel 000000093

artikel 000000094

artikel 000000095

artikel 000000096

artikel 000000097

artikel 000000098

artikel 000000099

artikel 000000100

artikel 000000101

artikel 000000102

artikel 000000103

artikel 000000104

artikel 000000105

artikel 000000106

artikel 000000107

artikel 000000108

artikel 000000109

artikel 000000110

artikel 000000111

artikel 000000112

artikel 000000113

artikel 000000114

artikel 000000115

artikel 000000116

artikel 000000117

artikel 000000118

artikel 000000119

artikel 000000120

artikel 000000121

artikel 000000122

artikel 000000123

artikel 000000124

artikel 000000125

artikel 000000126

artikel 000000127

artikel 000000128

artikel 000000129

artikel 000000130

artikel 000000131

artikel 000000132

artikel 000000133

artikel 000000134

artikel 000000135

artikel 000000136

artikel 000000137

artikel 000000138

artikel 000000139

artikel 000000140

mahjong 000136

mahjong 000137

mahjong 000138

mahjong 000139

mahjong 000140

mahjong 000141

mahjong 000142

mahjong 000143

mahjong 000144

mahjong 000145

mahjong 000146

mahjong 000147

mahjong 000148

mahjong 000149

mahjong 000150

mahjong 000151

mahjong 000152

mahjong 000153

mahjong 000154

mahjong 000155

mahjong 000156

mahjong 000157

mahjong 000158

mahjong 000159

mahjong 000160

mahjong 000161

mahjong 000162

mahjong 000163

mahjong 000164

mahjong 000165

mahjong 000166

mahjong 000167

mahjong 000168

mahjong 000169

mahjong 000170

mahjong 000171

mahjong 000172

mahjong 000173

mahjong 000174

mahjong 000175

mahjong 000176

mahjong 000177

mahjong 000178

mahjong 000179

mahjong 000180

mahjong 000181

mahjong 000182

mahjong 000183

mahjong 000184

mahjong 000185

article 10000506

article 10000507

article 10000508

article 10000509

article 10000510

article 10000511

article 10000512

article 10000513

article 10000514

article 10000515

article 10000516

article 10000517

article 10000518

article 10000519

article 10000520

article 10000521

article 10000522

article 10000523

article 10000524

article 10000525

article 10000526

article 10000527

article 10000528

article 10000529

article 10000530

article 10000531

article 10000532

article 10000533

article 10000534

article 10000535

article 10000536

article 10000537

article 10000538

article 10000539

article 10000540

article 10000541

article 10000542

article 10000543

article 10000544

article 10000545

article 10000546

article 10000547

article 10000548

article 10000549

article 10000550

article 10000551

article 10000552

article 10000553

article 10000554

article 10000555

article 22220411

article 22220412

article 22220413

article 22220414

article 22220415

article 22220416

article 22220417

article 22220418

article 22220419

article 22220420

article 22220421

article 22220422

article 22220423

article 22220424

article 22220425

article 22220426

article 22220427

article 22220428

article 22220429

article 22220430

article 22220431

article 22220432

article 22220433

article 22220434

article 22220435

article 22220436

article 22220437

article 22220438

article 22220439

article 22220440

article 22220441

article 22220442

article 22220443

article 22220444

article 22220445

article 22220446

article 22220447

article 22220448

article 22220449

article 22220450

news-1701