Ecologi

Disrupting an Industry…For this Reason we Launch “Zuidas Technologies”.

I still remember my first day after graduation when I joined Shaker consultancy group; which was ranked the first Mechanical, Electrical, Plumbing (MEP) consultant in Egypt in the year 2001. Their main office was in Mohandseen. At the time, Mohandseen was an upper-class district, most of its residents were the crème de la crème of the Egyptian society; it was the community of politicians, ministers, and artists.

We created designs for Heating, Ventilation, and Air Conditioning systems (HVAC) for all the significant projects in Egypt near the Nile river, like The Four Seasons hotels and Nile City.  One of the biggest projects I participated in was The American University in Cairo which is currently located in The Fifth Settlement district. In 2001, nobody lived in The Fifth Settlement, it was literally a desert, and in the time of 18 years, it turned into one of the most distinguished places in Cairo, to work, to study, and to live.

In 2008, I worked for Dar Alhandasah in Dubai. Now, in 2018 Dubai is another city. Its buildings and towers tell us the story of “How to build a city from scratch.”

Every building around the world tells its own story; however, I am always inspired by the stories of the technologies inside these buildings. I always dream of the buildings of tomorrow; their places, what they’re made of, and the story each building would tell the future generations.

Four years ago, I decided to follow my passion and start my own business; a company that works on buildings’ technologies and solutions. Today I’m developing my business model to introduce an advanced version that could take this industry to its highest levels. I believe that that could be achieved through raising the standards of buildings’ technologies, being energy efficient and smarter than before.

I am here today to lunch our new company Zuidas Technologies; an innovative integrated energy efficient solution to develop livable, energy efficient, and smart commercial buildings, and a turnkey solution provider from the basis of design till operation. Our core purpose is to create healthier working, living, and learning environments by using top-notch technologies. From this perspective, we extend our boundaries and keep innovating continuously to develop a new generation of buildings.

With a group of experts and professionals, we are establishing a new baseline for energy efficient buildings, using a new project delivery methodology to save up to 50% of the energy normally consumed.

Meeting the 50% energy savings goal is challenging, and according to the Advanced Energy Design Guides of Office Buildings written by the American Society of Heating, Refrigerating and Air-Conditioning Engineers, it requires essential principles:

  • 1- Obtain building owner buy-in. 

There must be a strong buy-in from the owner and the operator’s leadership and staff. The more they know about and participate in the planning and design process, the better they will be able to achieve the 50% energy saving goal. The building owner must set his goals and provide the guidance required to turn his vision into a reality.

  • 2- Assemble an experienced, innovative design team.

Interest and experience in designing energy-efficient buildings, innovative thinking, and the ability to work together as a team is critical to meeting the 50% goal. The team achieves this goal by creating a building that maximizes daylighting; minimizes process, heating, and cooling loads; and has highly efficient lighting and HVAC systems. Energy goals should be communicated in the request for proposal and design team selection based in part on the team’s ability to meet the goals. The design team implements the goals for the owner.

  • 3- Adopt an integrated design process. 

Cost-effective, energy-efficient design requires trade-offs among potential energy-saving features. This requires an integrated approach to building design. A highly efficient lighting system, for instance, may cost more than a conventional one, but because it produces less heat, the building’s cooling system can often be downsized. The greater the energy savings, the more complicated the trade-offs become and the more design team members must work together to determine the optimal mix of energy saving features. Because many options are available, the design team will have wide latitude in making energy-saving trade-offs.

  • 4- Consider a daylighting consultant.

Daylighting is an important energy savings strategy to achieve the 50% energy saving goal; however, it requires good technical daylighting design. If the design team does not have experience with a well-balanced daylighting design, it may need to add a daylighting consultant.

  • 5- Consider energy modeling.

This Guide provides a few design packages to help achieve energy savings of 50% without energy modeling, but whole-building energy modeling programs can provide more flexibility to evaluate the energy-efficient measures on an individual project. These simulation programs have learning curves of varying difficulty, but energy modeling for office design is highly encouraged and is considered necessary for achieving energy savings of 50%. Part of the key to energy savings is using the simulations to make envelope decisions first and then evaluating heating, cooling, and lighting systems. Developing HVAC load calculations is not energy modeling and is not a substitute for energy modeling.

  • 6- Use building commissioning.

Studies verify that building systems, no matter how carefully designed, are often improperly installed or set up and do not operate as efficiently as expected. The 50% goal can best be achieved through building commissioning (Cx), a systematic process of ensuring that all building systems—including envelope, lighting, and HVAC—perform as intended.

  • 7- Train building users and operations staff.

Staff training can be part of the building Cx process, but a plan must be in place to train staff for the life of the building to meet energy savings goals. The building’s designers and contractors normally are not responsible for the office after it becomes operational, so the building owner must establish a continuous training program that helps occupants and operation and maintenance staff maintain and operate the building for maximum energy efficiency. This training should include information about the impact of plug loads on energy use and the importance of using energy-efficient equipment and appliances.

  • 8- Monitor the building. 

A monitoring plan is necessary to ensure that energy goals are met over the life of the building. Even simple plans, such as recording and plotting monthly utility bills, can help ensure that the energy goals are met. Buildings that do not meet the design goals often have operational issues that should be corrected.

Under traditional design processes, energy use or a building’s overall energy performance is not typically discussed in any meaningful way by engineers, architects, and building owners at a conceptual design level discussion. For INTEGRATED PROJECT DELIVERY (IPD) to truly be successful at obtaining energy savings in the range of greater than 50%, this tendency needs to change. All parties need to engage in much more detailed dialog earlier in the design process—using a team approach— taking the time to understand how their portion of the work affects the greater design of the whole project.

PRINCIPLES OF INTEGRATED PROJECT DELIVERY (IPD)

Integrated Project Delivery (IPD) is a new concept for design and construction that uses a team approach to project management throughout all phases of the design process.

In a traditional system, the owner, designers, consultants, and constructors work on a fragmented basis, with success often based strictly on the profit received (to each) rather than the overall success of the final product. In IPD, all parties involved in the development of a building work together to achieve the common goal of maximizing multiple efficiencies of the building by having a more collaborative design and construction process. This approach is intended to not only save money but also provide higher-performing buildings that have been seen with the traditional approach.

IPD is a method that conscientiously moves toward a more open and transparent agreement, focusing on mutual benefits and rewards by encouraging parties to converge on the project outcomes rather than their individual goals. Project goals must be defined and recorded early in the project.

Figure 1-1 Traditional Project Design Team

Figure 1-2 Integrated Project Design Team

High-performance building design should be the focus for the future, and IPD will be the cornerstone for the evolution to more effective results in actual building performance.

USING IPD TO MAXIMIZE ENERGY EFFICIENCY

As noted previously, IPD revolves around key collaboration agreements meant to remove barriers between parties and to encourage early contributions of wisdom and experience. While other sources are better suited to provide guidance on the contractual and organizational aspects, this section provides an idealized design management guidance template that describes how to use the more open relationships to achieve high energy-efficiency goals in the building design. Figure 1-3 gives a snapshot of the key steps in each phase that help lead toward energy efficient solutions.

ONGOING TENANTS TRAINING

In buildings designed for low energy use, it is always important to remember that occupant behavior is crucial to achieving the anticipated performance. When people understand the goals of the building and their roles, they can substantially reduce energy use. It can be beneficial for the design and construction team to host a lunchtime talk for the initial tenants and describe the building’s design intent and sustainability features. This is the ideal venue to introduce the occupants to the tenant education guide described previously and to allow the local leadership to state their support for the energy-efficiency initiative in the building. It is important to forewarn occupants that although the building was commissioned, low-energy buildings sometimes take a season or two to reach their final optimized control strategies, so all occupants are invited to submit comments on performance as additional inputs for improving the operations. This type of personal engagement will not only encourage positive-impact behaviors with the initial tenants, but these first adopters can act as efficiency coaches for all future staff members

news-1701

yakinjp

yakinjp

rtp yakinjp

yakinjp

yakinjp

yakin jp

yakinjp id

maujp

maujp

maujp

\

sabung ayam online

sabung ayam online

SLOT MAHJONG

sabung ayam online

article 0000141

article 0000142

article 0000143

article 0000144

article 0000145

article 0000146

article 0000147

article 0000148

article 0000149

article 0000150

article 0000151

article 0000152

article 0000153

article 0000154

article 0000155

article 0000156

article 0000157

article 0000158

article 0000159

article 0000160

article 0000161

article 0000162

article 0000163

article 0000164

article 0000165

article 0000166

article 0000167

article 0000168

article 0000169

article 0000170

article 0000171

article 0000172

article 0000173

article 0000174

article 0000175

article 0000176

article 0000177

article 0000178

article 0000179

article 0000180

article 0000181

article 0000182

article 0000183

article 0000184

article 0000185

article 0000186

article 0000187

article 0000188

article 0000189

article 0000190

article 00046

article 00047

article 00048

article 00049

article 00050

article 00051

article 00052

article 00053

article 00054

article 00055

article 00056

article 00057

article 00058

article 00059

article 00060

article 00061

article 00062

article 00063

article 00064

article 00065

article 00066

article 00067

article 00068

article 00069

article 00070

article 00071

article 00072

article 00073

article 00074

article 00075

article 00076

article 00077

article 00078

article 00079

article 00080

article 00081

article 00082

article 00083

article 00084

article 00085

article 00086

article 00087

article 00088

article 00089

article 00090

article 00091

article 00092

article 00093

article 00094

article 00095

article 888836

article 888837

article 888838

article 888839

article 888840

article 888841

article 888842

article 888843

article 888844

article 888845

article 888846

article 888847

article 888848

article 888849

article 888850

article 888851

article 888852

article 888853

article 888854

article 888855

article 888856

article 888857

article 888858

article 888859

article 888860

article 888861

article 888862

article 888863

article 888864

article 888865

articel 000000171

articel 000000172

articel 000000173

articel 000000174

articel 000000175

articel 000000176

articel 000000177

articel 000000178

articel 000000179

articel 000000180

articel 000000181

articel 000000182

articel 000000183

articel 000000184

articel 000000185

articel 000000186

articel 000000187

articel 000000188

articel 000000189

articel 000000190

articel 000000191

articel 000000192

articel 000000193

articel 000000194

articel 000000195

articel 000000196

articel 000000197

articel 000000198

articel 000000199

articel 000000200

articel 000000201

articel 000000202

articel 000000203

articel 000000204

articel 000000205

articel 000000206

articel 000000207

articel 000000208

articel 000000209

articel 000000210

articel 000000211

articel 000000212

articel 000000213

articel 000000214

articel 000000215

articel 000000216

articel 000000217

articel 000000218

articel 000000219

articel 000000220

article 2000136

article 2000137

article 2000138

article 2000139

article 2000140

article 2000141

article 2000142

article 2000143

article 2000144

article 2000145

article 2000146

article 2000147

article 2000148

article 2000149

article 2000150

article 2000151

article 2000152

article 2000153

article 2000154

article 2000155

article 2000156

article 2000157

article 2000158

article 2000159

article 2000160

article 2000161

article 2000162

article 2000163

article 2000164

article 2000165

article 2000166

article 2000167

article 2000168

article 2000169

article 2000170

article 2000171

article 2000172

article 2000173

article 2000174

article 2000175

article 2000176

article 2000177

article 2000178

article 2000179

article 2000180

article 2000181

article 2000182

article 2000183

article 2000184

article 2000185

article 838000421

article 838000422

article 838000423

article 838000424

article 838000425

article 838000426

article 838000427

article 838000428

article 838000429

article 838000430

article 838000431

article 838000432

article 838000433

article 838000434

article 838000435

article 838000436

article 838000437

article 838000438

article 838000439

article 838000440

article 838000441

article 838000442

article 838000443

article 838000444

article 838000445

article 838000446

article 838000447

article 838000448

article 838000449

article 838000450

article 838000451

article 838000452

article 838000453

article 838000454

article 838000455

article 838000456

article 838000457

article 838000458

article 838000459

article 838000460

news-1701