Ecologi

Disrupting an Industry…For this Reason we Launch “Zuidas Technologies”.

I still remember my first day after graduation when I joined Shaker consultancy group; which was ranked the first Mechanical, Electrical, Plumbing (MEP) consultant in Egypt in the year 2001. Their main office was in Mohandseen. At the time, Mohandseen was an upper-class district, most of its residents were the crème de la crème of the Egyptian society; it was the community of politicians, ministers, and artists.

We created designs for Heating, Ventilation, and Air Conditioning systems (HVAC) for all the significant projects in Egypt near the Nile river, like The Four Seasons hotels and Nile City.  One of the biggest projects I participated in was The American University in Cairo which is currently located in The Fifth Settlement district. In 2001, nobody lived in The Fifth Settlement, it was literally a desert, and in the time of 18 years, it turned into one of the most distinguished places in Cairo, to work, to study, and to live.

In 2008, I worked for Dar Alhandasah in Dubai. Now, in 2018 Dubai is another city. Its buildings and towers tell us the story of “How to build a city from scratch.”

Every building around the world tells its own story; however, I am always inspired by the stories of the technologies inside these buildings. I always dream of the buildings of tomorrow; their places, what they’re made of, and the story each building would tell the future generations.

Four years ago, I decided to follow my passion and start my own business; a company that works on buildings’ technologies and solutions. Today I’m developing my business model to introduce an advanced version that could take this industry to its highest levels. I believe that that could be achieved through raising the standards of buildings’ technologies, being energy efficient and smarter than before.

I am here today to lunch our new company Zuidas Technologies; an innovative integrated energy efficient solution to develop livable, energy efficient, and smart commercial buildings, and a turnkey solution provider from the basis of design till operation. Our core purpose is to create healthier working, living, and learning environments by using top-notch technologies. From this perspective, we extend our boundaries and keep innovating continuously to develop a new generation of buildings.

With a group of experts and professionals, we are establishing a new baseline for energy efficient buildings, using a new project delivery methodology to save up to 50% of the energy normally consumed.

Meeting the 50% energy savings goal is challenging, and according to the Advanced Energy Design Guides of Office Buildings written by the American Society of Heating, Refrigerating and Air-Conditioning Engineers, it requires essential principles:

  • 1- Obtain building owner buy-in. 

There must be a strong buy-in from the owner and the operator’s leadership and staff. The more they know about and participate in the planning and design process, the better they will be able to achieve the 50% energy saving goal. The building owner must set his goals and provide the guidance required to turn his vision into a reality.

  • 2- Assemble an experienced, innovative design team.

Interest and experience in designing energy-efficient buildings, innovative thinking, and the ability to work together as a team is critical to meeting the 50% goal. The team achieves this goal by creating a building that maximizes daylighting; minimizes process, heating, and cooling loads; and has highly efficient lighting and HVAC systems. Energy goals should be communicated in the request for proposal and design team selection based in part on the team’s ability to meet the goals. The design team implements the goals for the owner.

  • 3- Adopt an integrated design process. 

Cost-effective, energy-efficient design requires trade-offs among potential energy-saving features. This requires an integrated approach to building design. A highly efficient lighting system, for instance, may cost more than a conventional one, but because it produces less heat, the building’s cooling system can often be downsized. The greater the energy savings, the more complicated the trade-offs become and the more design team members must work together to determine the optimal mix of energy saving features. Because many options are available, the design team will have wide latitude in making energy-saving trade-offs.

  • 4- Consider a daylighting consultant.

Daylighting is an important energy savings strategy to achieve the 50% energy saving goal; however, it requires good technical daylighting design. If the design team does not have experience with a well-balanced daylighting design, it may need to add a daylighting consultant.

  • 5- Consider energy modeling.

This Guide provides a few design packages to help achieve energy savings of 50% without energy modeling, but whole-building energy modeling programs can provide more flexibility to evaluate the energy-efficient measures on an individual project. These simulation programs have learning curves of varying difficulty, but energy modeling for office design is highly encouraged and is considered necessary for achieving energy savings of 50%. Part of the key to energy savings is using the simulations to make envelope decisions first and then evaluating heating, cooling, and lighting systems. Developing HVAC load calculations is not energy modeling and is not a substitute for energy modeling.

  • 6- Use building commissioning.

Studies verify that building systems, no matter how carefully designed, are often improperly installed or set up and do not operate as efficiently as expected. The 50% goal can best be achieved through building commissioning (Cx), a systematic process of ensuring that all building systems—including envelope, lighting, and HVAC—perform as intended.

  • 7- Train building users and operations staff.

Staff training can be part of the building Cx process, but a plan must be in place to train staff for the life of the building to meet energy savings goals. The building’s designers and contractors normally are not responsible for the office after it becomes operational, so the building owner must establish a continuous training program that helps occupants and operation and maintenance staff maintain and operate the building for maximum energy efficiency. This training should include information about the impact of plug loads on energy use and the importance of using energy-efficient equipment and appliances.

  • 8- Monitor the building. 

A monitoring plan is necessary to ensure that energy goals are met over the life of the building. Even simple plans, such as recording and plotting monthly utility bills, can help ensure that the energy goals are met. Buildings that do not meet the design goals often have operational issues that should be corrected.

Under traditional design processes, energy use or a building’s overall energy performance is not typically discussed in any meaningful way by engineers, architects, and building owners at a conceptual design level discussion. For INTEGRATED PROJECT DELIVERY (IPD) to truly be successful at obtaining energy savings in the range of greater than 50%, this tendency needs to change. All parties need to engage in much more detailed dialog earlier in the design process—using a team approach— taking the time to understand how their portion of the work affects the greater design of the whole project.

PRINCIPLES OF INTEGRATED PROJECT DELIVERY (IPD)

Integrated Project Delivery (IPD) is a new concept for design and construction that uses a team approach to project management throughout all phases of the design process.

In a traditional system, the owner, designers, consultants, and constructors work on a fragmented basis, with success often based strictly on the profit received (to each) rather than the overall success of the final product. In IPD, all parties involved in the development of a building work together to achieve the common goal of maximizing multiple efficiencies of the building by having a more collaborative design and construction process. This approach is intended to not only save money but also provide higher-performing buildings that have been seen with the traditional approach.

IPD is a method that conscientiously moves toward a more open and transparent agreement, focusing on mutual benefits and rewards by encouraging parties to converge on the project outcomes rather than their individual goals. Project goals must be defined and recorded early in the project.

Figure 1-1 Traditional Project Design Team

Figure 1-2 Integrated Project Design Team

High-performance building design should be the focus for the future, and IPD will be the cornerstone for the evolution to more effective results in actual building performance.

USING IPD TO MAXIMIZE ENERGY EFFICIENCY

As noted previously, IPD revolves around key collaboration agreements meant to remove barriers between parties and to encourage early contributions of wisdom and experience. While other sources are better suited to provide guidance on the contractual and organizational aspects, this section provides an idealized design management guidance template that describes how to use the more open relationships to achieve high energy-efficiency goals in the building design. Figure 1-3 gives a snapshot of the key steps in each phase that help lead toward energy efficient solutions.

ONGOING TENANTS TRAINING

In buildings designed for low energy use, it is always important to remember that occupant behavior is crucial to achieving the anticipated performance. When people understand the goals of the building and their roles, they can substantially reduce energy use. It can be beneficial for the design and construction team to host a lunchtime talk for the initial tenants and describe the building’s design intent and sustainability features. This is the ideal venue to introduce the occupants to the tenant education guide described previously and to allow the local leadership to state their support for the energy-efficiency initiative in the building. It is important to forewarn occupants that although the building was commissioned, low-energy buildings sometimes take a season or two to reach their final optimized control strategies, so all occupants are invited to submit comments on performance as additional inputs for improving the operations. This type of personal engagement will not only encourage positive-impact behaviors with the initial tenants, but these first adopters can act as efficiency coaches for all future staff members

news-1701

yakinjp

MAUJP

MAUJP

MAUJP

SATGASJITU

SLOT GACOR

SALAMJITU

SATGASJITU

SEMOGAJITU

SALAMJITU

Slot Gacor

MAUJP

Slot Gacor

SLOT GACOR

https://kominfo.belukab.go.id/

https://www.kampunginggris.id/

https://jhpartners.net/

informasi terbaru kabupaten belu 00000101

informasi terbaru kabupaten belu 00000102

informasi terbaru kabupaten belu 00000103

informasi terbaru kabupaten belu 00000104

informasi terbaru kabupaten belu 00000105

informasi terbaru kabupaten belu 00000106

informasi terbaru kabupaten belu 00000107

informasi terbaru kabupaten belu 00000108

informasi terbaru kabupaten belu 00000109

informasi terbaru kabupaten belu 00000110

informasi terbaru kabupaten belu 00000111

informasi terbaru kabupaten belu 00000112

informasi terbaru kabupaten belu 00000113

informasi terbaru kabupaten belu 00000114

informasi terbaru kabupaten belu 00000115

informasi terbaru kabupaten belu 00000116

informasi terbaru kabupaten belu 00000117

informasi terbaru kabupaten belu 00000118

informasi terbaru kabupaten belu 00000119

informasi terbaru kabupaten belu 00000120

informasi terbaru kabupaten belu 00000121

informasi terbaru kabupaten belu 00000122

informasi terbaru kabupaten belu 00000123

informasi terbaru kabupaten belu 00000124

informasi terbaru kabupaten belu 00000125

informasi terbaru kabupaten belu 00000126

informasi terbaru kabupaten belu 00000127

informasi terbaru kabupaten belu 00000128

informasi terbaru kabupaten belu 00000129

informasi terbaru kabupaten belu 00000130

informasi terbaru kabupaten belu 00000131

informasi terbaru kabupaten belu 00000132

informasi terbaru kabupaten belu 00000133

informasi terbaru kabupaten belu 00000134

informasi terbaru kabupaten belu 00000135

informasi terbaru kabupaten belu 00000136

informasi terbaru kabupaten belu 00000137

informasi terbaru kabupaten belu 00000138

informasi terbaru kabupaten belu 00000139

informasi terbaru kabupaten belu 00000140

informasi terbaru kabupaten belu 00000141

informasi terbaru kabupaten belu 00000142

informasi terbaru kabupaten belu 00000143

informasi terbaru kabupaten belu 00000144

informasi terbaru kabupaten belu 00000145

informasi terbaru kabupaten belu 00000146

informasi terbaru kabupaten belu 00000147

informasi terbaru kabupaten belu 00000148

informasi terbaru kabupaten belu 00000149

informasi terbaru kabupaten belu 00000150

informasi terbaru kabupaten belu 00000151

informasi terbaru kabupaten belu 00000152

informasi terbaru kabupaten belu 00000153

informasi terbaru kabupaten belu 00000154

informasi terbaru kabupaten belu 00000155

informasi terbaru kabupaten belu 00000156

informasi terbaru kabupaten belu 00000157

informasi terbaru kabupaten belu 00000158

informasi terbaru kabupaten belu 00000159

informasi terbaru kabupaten belu 00000160

article 48666670361

article 48666670362

article 48666670363

article 48666670364

article 48666670365

article 48666670366

article 48666670367

article 48666670368

article 48666670369

article 48666670370

article 48666670371

article 48666670372

article 48666670373

article 48666670374

article 48666670375

article 48666670376

article 48666670377

article 48666670378

article 48666670379

article 48666670380

article 48666670381

article 48666670382

article 48666670383

article 48666670384

article 48666670385

article 48666670386

article 48666670387

article 48666670388

article 48666670389

article 48666670390

article 48666670391

article 48666670392

article 48666670393

article 48666670394

article 48666670395

article 48666670396

article 48666670397

article 48666670398

article 48666670399

article 48666670400

article 48666670401

article 48666670402

article 48666670403

article 48666670404

article 48666670405

article 48666670406

article 48666670407

article 48666670408

article 48666670409

article 48666670410

article 58666670411

article 58666670412

article 58666670413

article 58666670414

article 58666670415

article 58666670416

article 58666670417

article 58666670418

article 58666670419

article 58666670420

article 58666670421

article 58666670422

article 58666670423

article 58666670424

article 58666670425

article 58666670426

article 58666670427

article 58666670428

article 58666670429

article 58666670430

article 58666670431

article 58666670432

article 58666670433

article 58666670434

article 58666670435

article 58666670436

article 58666670437

article 58666670438

article 58666670439

article 58666670440

article 58666670441

article 58666670442

article 58666670443

article 58666670444

article 58666670445

article 58666670446

article 58666670447

article 58666670448

article 58666670449

article 58666670450

article 58666670451

article 58666670452

article 58666670453

article 58666670454

article 58666670455

article 58666670456

article 58666670457

article 58666670458

article 58666670459

article 58666670460

article 58666670461

article 58666670462

article 58666670463

article 58666670464

article 58666670465

article 58666670466

article 58666670467

article 58666670468

article 58666670469

article 58666670470

article 58666670471

article 58666670472

article 58666670473

article 58666670474

article 58666670475

article 58666670476

article 58666670477

article 58666670478

article 58666670479

article 58666670480

article 58666670481

article 58666670482

article 58666670483

article 58666670484

article 58666670485

article 58666670486

article 58666670487

article 58666670488

article 58666670489

article 58666670490

article 58666670491

article 58666670492

article 58666670493

article 58666670494

article 58666670495

article 58666670496

article 58666670497

article 58666670498

article 58666670499

article 58666670500

article 58666670501

article 58666670502

article 58666670503

article 58666670504

article 58666670505

article 58666670506

article 58666670507

article 58666670508

article 58666670509

article 58666670510

artikel 88666670411

artikel 88666670412

artikel 88666670413

artikel 88666670414

artikel 88666670415

artikel 88666670416

artikel 88666670417

artikel 88666670418

artikel 88666670419

artikel 88666670420

artikel 88666670421

artikel 88666670422

artikel 88666670423

artikel 88666670424

artikel 88666670425

artikel 88666670426

artikel 88666670427

artikel 88666670428

artikel 88666670429

artikel 88666670430

artikel 88666670431

artikel 88666670432

artikel 88666670433

artikel 88666670434

artikel 88666670435

artikel 88666670436

artikel 88666670437

artikel 88666670438

artikel 88666670439

artikel 88666670440

artikel 88666670441

artikel 88666670442

artikel 88666670443

artikel 88666670444

artikel 88666670445

artikel 88666670446

artikel 88666670447

artikel 88666670448

artikel 88666670449

artikel 88666670450

artikel 88666670451

artikel 88666670452

artikel 88666670453

artikel 88666670454

artikel 88666670455

artikel 88666670456

artikel 88666670457

artikel 88666670458

artikel 88666670459

artikel 88666670460

artikel 88666670461

artikel 88666670462

artikel 88666670463

artikel 88666670464

artikel 88666670465

artikel 88666670466

artikel 88666670467

artikel 88666670468

artikel 88666670469

artikel 88666670470

artikel 88666670471

artikel 88666670472

artikel 88666670473

artikel 88666670474

artikel 88666670475

artikel 88666670476

artikel 88666670477

artikel 88666670478

artikel 88666670479

artikel 88666670480

artikel 88666670481

artikel 88666670482

artikel 88666670483

artikel 88666670484

artikel 88666670485

artikel 88666670486

artikel 88666670487

artikel 88666670488

artikel 88666670489

artikel 88666670490

artikel 88666670491

artikel 88666670492

artikel 88666670493

artikel 88666670494

artikel 88666670495

artikel 88666670496

artikel 88666670497

artikel 88666670498

artikel 88666670499

artikel 88666670500

artikel 88666670501

artikel 88666670502

artikel 88666670503

artikel 88666670504

artikel 88666670505

artikel 88666670506

artikel 88666670507

artikel 88666670508

artikel 88666670509

artikel 88666670510

artikel 98666670511

artikel 98666670512

artikel 98666670513

artikel 98666670514

artikel 98666670515

artikel 98666670516

artikel 98666670517

artikel 98666670518

artikel 98666670519

artikel 98666670520

artikel 98666670521

artikel 98666670522

artikel 98666670523

artikel 98666670524

artikel 98666670525

artikel 98666670526

artikel 98666670527

artikel 98666670528

artikel 98666670529

artikel 98666670530

artikel 98666670531

artikel 98666670532

artikel 98666670533

artikel 98666670534

artikel 98666670535

artikel 98666670536

artikel 98666670537

artikel 98666670538

artikel 98666670539

artikel 98666670540

artikel 98666670541

artikel 98666670542

artikel 98666670543

artikel 98666670544

artikel 98666670545

artikel 98666670546

artikel 98666670547

artikel 98666670548

artikel 98666670549

artikel 98666670550

news-1701