Al Tujjari Wafa bank, Nasr city branch, is a three-store branch that needed renovation but can’t be closed, so a work plan was established to take it half floor by half floor and still finish the work on time without any interruption in the branch workflow. 365 Ecology’s technical office also did a value engineering study along with the project’s consultant and owner which reduced the initial cost by 20% while maintain a sufficient cooling load and reliable HVAC system.  

Tujjari wafa bank Read More »

Le Méridien Heliopolis

Meriden Heliopolis is one of the classis residence hotel on the Egyptian Capital . SABIANA was the choice from the consultant and the hotel while the construction on 1980’s and it is as well the choice while renovation due to the minimal troubles and the best ever quality in terms of sound power and air purity. 365 Ecology had been contacted by the hotel management to replace the old units with the modern technology from SABIANA Fan Coil Units. 60 nos. were replaced and installed by the highly qualified installation team from 365 Ecology.  

Le Méridien Heliopolis Read More »

Al Azhar House

Al Azhar House is a historical building with unique architecture in the heart of Al Azhar area. Our mission was to renovate the building and providing it with a special air conditioning system while preserving its architecture and keeping it environmentally friendly. The installation operations for this project were challenging and required great attention to details. 365 Ecology is proud to have managed to install the VRF system without occurring any damages to the house, believing in the importance of Egyptian cultural preservation.     Equipment installed LG – Multi V4 ODUs 13 IDUs  

Al Azhar House Read More »

El Sewedy Education – The Knowledge Hub

The Knowledge hub is a multidisciplinary project constituting of different international universities clustered together in the new capital of Egypt. The project matches the needs of the Egyptian economy with offerings that complement the educational ecosystem. The timeline of the project was the main challenge facing 365 Ecology, yet in 5 months it was successfully accomplished.   Equipment installed LG – Multi V 5 ODUs Concealed IDUs  

El Sewedy Education – The Knowledge Hub Read More »

Sumitomo Electric Factory

Sumitomo Electric Industries was established in 1897 in Japan and is now a leading company in electric wiring and optical fibers. With a 200 million dollars’ investment, Sumitomo constructed a wiring factory in the industrial area in the 6th of October city to start exporting to the whole world.   365 Ecology contracted the HVAC and firefighting systems. With energy efficient consideration in the operation, 365 Ecology used LG inverter motor single package for the first time in Egypt to achieve substantial reduction in energy consumption.   Equipment installed 11 LG – inverter motor single package  

Sumitomo Electric Factory Read More »

Cairo Stadium Renovation

As Egypt is hosting the Africa Cup of Nations 2019, Cairo’s main stadium and Egypt’s lucky charm is being totally renovated. 365 Ecology undertook the AC system for the Sky Box, news reporters’ cabin, and the players’ rooms. It was a race with time, as we had to supply and install the AC system in such a short time so that the stadium would be ready for the opening ceremony.   Equipment installed 6 LG – Multi V 5 ODUs 64 Concealed IDUs  

Cairo Stadium Renovation Read More »

El Gamel Airport

Petroleum Air Service (PAS) is a leading airline operator that supports the oil industry by transfer ing its personnel to and from onshore and off-shore rigs. El Gamel airport is one of its vital airports as it plays an important role in sustaining the area’s plans of industrial expansion and in serving Zohr field. Within the airport’s plan of expansion, a new passengers building and a new hanger are included. Here comes 365 Ecology’s role, it has provided the HVAC solution for the whole project, knowing that the airport is on the coast of the Mediterranean, the AHU was provided copper tubes, copper fins and LG – Multi V 5 is provided with an “ocean black fin” coated condenser to withstand coaster humidity and salinity. Equipment installed 6 LG – Multi V 5 ODUs 66 Concealed IDUs 1 Cu – Cu, total fresh air AHU connected to VRF system Madkour Admin building: With more than 30 years of experience in the construction field, Madkour where expanding to a new office, and we –proudly– provided it with an energy efficient VRF system. This building is not only acknowledged as a project with an esteemed client, but it was the beginning of a lucrative business partnership leading to several projects with Madkour afterwards. Equipment installed 6 LG – Multi V 5 ODUs 100 Concealed IDUs  

El Gamel Airport Read More »