Ecologi

Case Stories

El Sewedy Education

El Sewedy Education – The Knowledge Hub Ph1 &  Ph 2 The Knowledge hub is a multidisciplinary project constituting of different international universities clustered together in the new capital of Egypt. The project matches the needs of the Egyptian economy with offerings that complement the educational ecosystem. The timeline of the project was the main challenge facing 365 Ecology, yet in 5 months it was successfully accomplished.   

El Sewedy Education Read More »

Madkour Admin Building

With more than 30 years of experience in the construction field, Madkour where expanding to a new office, and we –proudly– provided it with an energy efficient VRF system. This building is not only acknowledged as a project with an esteemed client, but it was the beginning of a lucrative business partnership leading to several projects with Madkour afterwards.  

Madkour Admin Building Read More »

Banque Misr

Banque Misr was established in 1920 by the pioneer economist and financial expert Mohamed Talaat Harb Pasha. Banque Misr’s Fifth Settlement Branch was designed to be another artistic piece on such a large scale. In collaboration with Mahfouz company for architect & planning, the HVAC system is designed with the VRF Technology, and to maximize the system’s efficiency a hot water supply was applied through the waste heat.  

Banque Misr Read More »

Phosphate Misr HQ

Under the umbrella of the ministry of petroleum and mineral resources, Phosphate Misr Co. is responsible for Egypt’s production of high-quality phosphate. Moving to a new headquarter in Cairo, 365 Ecology was responsible for providing an HVAC solution that can transform a residential tower into an administration office.  

Phosphate Misr HQ Read More »

Tujjari wafa bank

Al Tujjari Wafa bank, Nasr city branch, is a three-store branch that needed renovation but can’t be closed, so a work plan was established to take it half floor by half floor and still finish the work on time without any interruption in the branch workflow. 365 Ecology’s technical office also did a value engineering study along with the project’s consultant and owner which reduced the initial cost by 20% while maintain a sufficient cooling load and reliable HVAC system.  

Tujjari wafa bank Read More »

Le Méridien Heliopolis

Meriden Heliopolis is one of the classis residence hotel on the Egyptian Capital . SABIANA was the choice from the consultant and the hotel while the construction on 1980’s and it is as well the choice while renovation due to the minimal troubles and the best ever quality in terms of sound power and air purity. 365 Ecology had been contacted by the hotel management to replace the old units with the modern technology from SABIANA Fan Coil Units. 60 nos. were replaced and installed by the highly qualified installation team from 365 Ecology.  

Le Méridien Heliopolis Read More »

Spinneys Shrouk

After studying two branches with Spinneys group, 365 Ecology was awarded el Shorouk branch to supply and install a competitive initial cost and a cost-efficient running cost VRF system. But to make a solid case, design data should be validated on the running systems, so smart power meters were installed to create a year log of power consumption which proved the case and many branches are to follow.  

Spinneys Shrouk Read More »