Ecologi

Tujjari wafa bank

Al Tujjari Wafa bank, Nasr city branch, is a three-store branch that needed renovation but can’t be closed, so a work plan was established to take it half floor by half floor and still finish the work on time without any interruption in the branch workflow.

365 Ecology’s technical office also did a value engineering study along with the project’s consultant and owner which reduced the initial cost by 20% while maintain a sufficient cooling load and reliable HVAC system.